Tamarisk Fire Station 49

New construction of a single story, 9144 SF fire station. Building includes emergency generator with backup fuel. New site to include new driveways, parking, hardscape, trash enclosure, carports, perimeter wall. WakeCo delivered this essential civic facility using General Contracting standards that prioritize public safety and durability.

Clement MS Kitchen HVAC Installation

Clement Kitchen

Kitchen Building N Remodel & new kitchen equipment. Provide new hvac units, roof patching, MEP, new picket fence enslosure. This HVAC installation project was completed through our General Contracting services, focusing on energy efficiency and mechanical precision.

Project AG 39 Buena Vista E.S. Relo Classroom, Playground, Shade Structure

Buena-Vista

Addition of One 24′ x 40′ Refurbished Relocatable Classroom Building, One 30′ x 40′ PC Shade Structure, Remove and replace a new playground equipment, and all associated site work. Our team utilized Construction Management to coordinate the specialized installation of playground structures and relocatable classrooms.

HVAC Upgrade at District Office

HVAC Upgrade at District Office Img8

Upgrades to HVAC system at existing admin building. Occupied and open during renovation. We leveraged our Pre-Construction expertise to ensure this HVAC modernization was completed with minimal office downtime.

Interim Fire Station No. 11

Interim Fire Station 11 - Feb 8 2024 - Noel Alva-27

Temporary building relocation, new metal building, and new sprung structure. Improvements include concrete paving, asphalt paving, chain link fence and gates, utility connections and site lighting. This fast-track project showcases our capacity for Construction Management within temporary yet critical public infrastructure.

Terrace Hills Middle School Interim Housing Project

Terrace Hills Middle School Interim Housing Project Img5

Relocation of 5 existing relo buildings with associated site utilities, hardsacpe, fire alarms / ramps. This project showcases our ability to provide Construction Management for critical interim housing during major campus renovations.

Colegate Building phase II Renovations 2nd floor project

Second Story interior renovation. Remove wallcovering, flooring, and acoustical tile ceiling. Replace with all new. WakeCo managed this multi-phase renovation, providing seamless Construction Management for the 2nd-floor improvements.

VESD Playground Upgrades at (4) Locations

VESD Playground Upgrades at (4) Locations Img1

Playground equipment playground resurfacing, and site access upgrades. WakeCo managed these multi-location playground upgrades using comprehensive General Contracting to ensure safety compliance across the district.

Park View HVAC Improvements BP 4 – General

Park-view

All work required to remove and replace existing HVAC units with new units of same tonnage and higher energy efficiency. As part of the general improvements for Park View, WakeCo provided the General Contracting oversight needed for these mechanical upgrades.